Blade Replacement
Installation Steps:
- Identify the 2 blades with the rounded corners
- Ensure that the nibed counter-sunked bolts are seated properly
- Place the blades with the rounded edges facing to the outside
- Position all the inner blades with bolts as illustrated
- Place spacers between the blades
- Apply light tension to the blades
- Confirm that the all the blades are well seated against the spacers
- Clamp blades thoroughly
- Install deflectors
- Place spacers for the mainframe in position
- Arrange the wrapping appropriately
- Inflate the air bladder to 80kpa
- Position the mainframe and parallelogram system
- Place all the flat washers
- Followed by all the spring washers
- Hand tighten all the lock nuts
- Tighten lock nuts with wrench
- Finally, torque all lock nuts
- Remove blade unit from the alignment tool
- Visually inspect that all the blades are lined
- If a discrepancy is found, do final adjustment
- The DirtWhacker unit is now ready to be mounted on a conveyor system
Secondary Cleaner Blade Installation Video
|
|