Procedure 01

There are two set ways of installing the DirtWhacker Primary Belt Cleaners this is the first method. To install the DirtWhacker Primary Cleaner unit successfully, please view/print the following installation identification drawings:

Installation Drawings :

  1. DW 1921 Primary side view installation identification
  2. DW 1922 Primary top view installation identification
  3. DW 1923 Primary rear view installation identification
  4. DW 1931 Primary head pulley angle installation identification
  5. DW 1932 Primary blade angle installation Identification

Installation Drawings :

  1. Mark the center of the head pulley shaft as S6
  2. From S6 extend a horizontal (0°) line S5 to the outer radius of the head pulley
  3. From line S5 measure 30°down on the outer radius of the head pulley
  4. Extend line S4 at 30° from S6 to the outer radius of the head pulley
  5. Mark S1 where S4 encounter the outer radius of the head pulley
  6. From S1 extend line S2 vertically down
  7. From S1 measure 300 mm vertically down on line S2
  8. On the 300 mm mark extend a horizontal (0°) line S3
  9. Mount the main mounting brackets utilizing lines S2 and S3 (Drawing: DW 1932)
  10. Pump air bladder to 50kpa (8psi)
  11. Measure distance L2 (Drawing: DW 1922 and DW 1923)
  12. Loosen bolts N
  13. Adjust extension shafts to distance L1 (L1 = L2 + 10 mm)
  14. Equalize measurement L4 and L5
  15. Tighten bolts N and locknuts
  16. Remove bolts A and Clamp Block Cap M2 on the near side (Drawing: DW 1921)
  17. Loosen bolts A on the far side by three full turns
  18. Insert one round section of extension piece into Clamp Block M1/M2 on the far side
  19. Place the remaining extension piece round section into Clamp Block M1 on the near side
  20. Replace Clamp Block Cap M2 and bolts A on the near side
  21. Ensure that bolts A on the near and far side are loosened by one full turn (Drawing: DW 1921)
  22. Turn the unit on the horizontal axis till the primary unit is positioned at 45 degrees (Drawing: DW 1932)
  23. Tighten bolts A - both sides
  24. Loosen bolts C - both sides one full turn
  25. Move the unit towards the head pulley until the blades touch the belt on the near and far sides uniformly
  26. Tighten bolts C - both sides
  27. Deflate the air bladder completely
  28. Loosen bolts B and move angle brackets E towards Clamp Blocks M1/M2 on both sides
  29. Tighten bolts B - both sides
  30. Loosen bolts C - both sides
  31. By means of bolts G move clamping blocks M1/M2 by 20mm towards head pulley - both sides
  32. Lock bolt G with locknut G1 - both sides
  33. Tighten bolts C - both sides
  34. Inflate air bladder 30-70kpa to attain ideal cleaning
    a. Depending on belt speed
    b. Depending on belt condition
    c. Depending on stickiness of material
    d. Depending on moisture content of material